Design.Build.Beby FutureKind LAB TIME --:--:-- MT

Lighting controls / Preconstruction + submittals

Protect the quote. Prepare the controls submittal.

Review drawings against quoted scope before release. After award, reconcile the sold BOM, prepare the design package and surface the remaining issues. Your estimator and controls designer retain the final decisions.

Built from more than a decade of hands-on controls estimating, quotations, project management and submittal delivery.

1 of 5Who this is for

For the teams that deliver the controls package.

Lighting-controls rep agencies, quotations departments, design teams and Division 26 contractors producing bids, shop drawings and submittals.

If your team moves between sold quotes, drawings, device schedules and design files to finish a submittal, this workflow is built around that work.

2 of 5What you get

Review the bid. Prepare the package. Resolve the gaps.

Check the quote. Compare plan and specification requirements with the quoted scope. Surface omissions, exclusions, allowances and questions with drawing references for the estimator.

Prepare the submittal. Find the correct sold version, stage the design files and documentation, and reconcile the equipment and services in the BOM against the package.

Close the review. Check layouts, sequences, schedules and print-page coverage. Hand the estimator or designer an ordered list of discrepancies and decisions to resolve before release.

The engagement can start at quote review, BOM reconciliation or submittal preparation, based on where your team needs capacity.

3 of 5Scope

Start with one controls workflow.

Bring a representative quote-review, rebid or submittal-preparation workflow. I’ll demonstrate the relevant working capability and define the deliverables and review responsibilities before work begins.

  1. 01Show me the work.Your bid set or sold quote, relevant drawings, files and the steps your team repeats.
  2. 02See the working system.Source-backed quote findings, BOM reconciliation, package preparation and reviewer handoff.
  3. 03Put it to work.Agree on the deliverables, deployment method and commercial terms. Start with one defined workflow, then expand where the results justify it.

The system prepares and checks the files. Your estimator or designer retains the final design, pricing and release decisions.

4 of 5Proof

Built from years at the controls desk.

Controls submittal packages completed across my career. More than a decade of estimating, quotations, project management and submittal delivery shaped the system I run today.

Today the software runs on live controls work: staging the correct version, preparing documentation, reconciling against the sold quote, checking layouts, and surfacing what must be resolved before release.

$238,043 in pricing errors caught across $4.4M of quotes and submittals, 67 controls jobs so far.

Watch the bid-review desk identify scope and quote discrepancies directly from the project documents.

5 of 5How to start

Bring me the controls workflow you want to change.

Tell me how your team prepares controls submittals, handles revisions or reconciles the BOM. I’ll show you the working software and outline what it would take to put it on your jobs.

Start with a brief description.